Sewage Treatment Plant

Project Details

Case study: willowmead developments

Case Study: 20 Back-to-Back Sewage Treatment Plant Installs in the First 9 Months of 2025

In the first nine months of 2025, Willowmead Developments completed 20 full sewage treatment plant installations across Hertfordshire and surrounding counties — from Epping Green to Elstree.

Each project was delivered on time, to full General Binding Rules compliance, and tailored to each site’s specific environmental and technical requirements.

This milestone highlights Willowmead’s reputation for:

  • Reliable project management

  • Consistent installation quality

  • Environmental compliance and sustainability

Metric Result
Installations Completed 20
Timeframe January – September 2025
Average Turnaround Time 7–9 days
System Type Tricel Novo & Vento Systems
Regulatory Compliance 100% General Binding Rules compliant
Customer Satisfaction 5/5 based on client feedback

Our Process

Each installation followed our trusted step-by-step process:

  1. Site Assessment — Initial inspection and soil/percolation checks

  2. System Design — Selecting the right Tricel system for each property

  3. Permit & Compliance Checks — Ensuring full GBR and EA adherence

  4. Installation & Testing — Complete fit-out, electrical commissioning, and inspection

  5. Reinstatement — Restoring the property with clean, finished landscaping

Featured Project – Install #20 (Elstree, near Borehamwood)

“20 installs in 9 months — not bad for our small team.”

📍 Location: Elstree, Hertfordshire
📅 Completion Date: September 2025

Van

Texture Wooden

Full Project Timeline (Jan–Sep 2025)

A visual journey through our 20 sewage treatment plant installations completed between January and September 2025.
Each project showcases Willowmead Developments’ attention to detail, compliance with the General Binding Rules, and commitment to clean, efficient reinstatement.

Scroll through to see examples of:

  • Tricel Novo and Vento system installations

  • Complex drainage field constructions

  • High water table and shared-property solutions

  • Before-and-after transformations

Every image represents a site where we delivered full compliance, minimal disruption, and a flawless finish.

📸 View the complete photo series on our Facebook page for all 20 installations:
👉 See All Install Photos on Facebook

Challenges and Solutions

High Water Table Sites

Projects in Higher Denham and Sandon Barn required bespoke engineering, including steel shutter boxes and raised drainage designs to prevent groundwater contamination.

Historic & Sensitive Locations

At Aldenham’s 13th-century cottage, care was taken to protect existing structures while upgrading outdated systems.

Regulatory Complexity

Some sites (like Watford) required Environment Agency permits. Willowmead handled all paperwork and compliance verifications internally.

What This Proves

Client Feedback

“Willowmead handled everything — from the testing to the reinstatement. Professional and reliable throughout.”
Client, Hertfordshire

“They made compliance simple. The site was spotless when they finished.”
Homeowner, St Albans

About Willowmead Developments

Willowmead Developments specializes in sewage treatment plant installations, drainage field design, and General Binding Rules compliance checks across the South East.

Our small, dedicated team delivers big results — combining technical precision, environmental awareness, and practical experience to provide homeowners with fully compliant, long-lasting wastewater solutions.

Contact us today

Considering a new sewage treatment plant or system replacement?
We’ll help you meet every regulation and complete the job efficiently — just like we’ve done 20 times already this year.

📞 Call Us Today: +44 7812 687026
📩 Book a Site Survey → [CTA Button]

Project Details

Don't Hesitate To Contact Us

Have a similar project or need a compliant sewage treatment system?
Our team is ready to help you meet the General Binding Rules quickly and affordably.

Scroll to Top

Claim Your Report Today

Please fill out The form below, and we'll call you in less than 10 min.